Commissioning is one of the key steps towards putting into service a new nuclear facility, or a new system, structure or component within an existing facility. Commissioning activities need to be planned early in the design and procurement process, with careful consideration of eventual acceptance criteria and test methods. This publication describes commissioning in its basic form, the commissioning process specific to nuclear power plants, the relevant management system requirements, typical organizational models and critical human resources issues. It also provides details on experience and lessons learned in Member States. The publication will be of use to all stakeholders involved in the commissioning of nuclear power plants, including owner/operators, contractors, engineers, regulatory bodies and vendors.

Cover Image
ISBN
978-92-0-102816-7
Publication Original Id
10975
Publication Year
2018
Publication Date
Publication Issue Date
Publication Series Info
NP-T-2.10
Price
48.00
Number of Pages
133
Number of Figures
31
Publication Medium
Print (Paper)
Keywords
IAEA Nuclear Energy, Nuclear Power Planning, Economics, Nuclear Power Plants, NPPs, Commissioning, Design, Construction, Safety Measures, Nuclear Facilities, Structure, Component, Design, Procurement Process, Acceptance Criteria, Test Methods, Management System, Human Resources, Lessons Learned, Member States, Stakeholders, Operators, Regulatory Bodies, Vendors, Safety Requirements, Standards, Commissioning Process, Organizational Models, Training, Safety Aspects, Documentation
Publication File Type
application/pdf
Publication File Size
5420
Keep tags on import
Off
Skip on import
Off
Authored date
feed hash
93ff204d292e8d478d675bbc0649d4ab