Integrated risk management (IRM) is particularly important during the preparation and construction phases of a nuclear power plant (NPP) and anticipates the risks that could arise during the operation and decommissioning phases. This publication is designed to enhance stakeholders' understanding of the fundamental processes, procedures, and methods for IRM. Practical guidelines are provided and best practices shared. The importance of having appropriate risk management policies, especially when considering the various contractual and organizational arrangements in different construction entities, operating organizations and Member States is emphasized. Tables are provided throughout the publication to indicate the causes of risks and their impacts on the applicable NPP or project. Economic evaluation techniques are also introduced. Member States contemplating expanding their existing nuclear power plant fleets can be expected to benefit from this publication, but it will likely be most valuable for Member States newly embarking upon a nuclear power programme.

Cover Image
ISBN
978-92-0-101423-8
Publication Original Id
15146
Publication Year
2023
Publication Date
Publication Issue Date
Publication Series Info
NR-T-2.15
Price
44.00
Number of Pages
153
Number of Figures
30
Publication Medium
Print (Paper)
Keywords
IAEA Nuclear Energy, Integrated Life Cycle Risk Management, New Nuclear Power Plants, NPP, Safety Measures, Risk Management Framework, Internal and External Risks, Economic Risk Management, Profitability, Impact, Project Development, Construction, Operation Phase Risks, Decommissioning Phases, Organizational Culture, NPP Owners, Operators, Stakeholders, Integrated Risk Management, IRM, Fundamental Processes, Procedures, Methods, Guidelines, Best Practices, Risk Management Policies, Different Construction Entities, Operating Organizations, Member States, Economic Evaluation Techniques, Nuclear Power Programme, Risk Registers, Risk Management Strategies, Sources of Risks, Economic Risk Evaluation, Modelling Nuclear Project Economics, Costs, Financial Assumptions, Lifetime Risk Analysis, Economic Model, Scenario Analysis, Project Development Phase Risk Management, IAEA Milestones Approach, Licensing, Engineering Readiness, Procurement, Material and Supply Chain Readiness, Material Inspection, Design Change Process, Review
Publication File Type
application/pdf
Publication File Size
5862
Epub File SIze
16381
Keep tags on import
Off
Skip on import
Off
Authored date
feed hash
9e2e1917b2a5a7e4ffd5e403729e6a17